Last-mile connections / CONFIGURATION GUIDE

FTTH drop cable

Specify the connection environment and termination method for the final drop. A flat black cable photo does not establish its fiber grade, jacket classification or suitability for an aerial span.

Request this product

Reference configurations for quotation. Exact model, availability and documents are confirmed for the selected item.

FTTH drop cable reference family photograph
Family reference photo. Confirm the exact configuration and matching model photo in the quotation.

BUILD A COMPARABLE REQUEST

Configuration & specification checklist

FieldInclude in your RFQ
Fiber countState the required number of fibers, such as a 1F or 2F project request.
Fiber gradeSpecify the required fiber grade, including G.657.A1 or G.657.A2 where required by the project.
ConstructionState flat or round profile and with/without messenger wire.
EnvironmentConfirm indoor, outdoor or indoor/outdoor use and the required jacket classification.
LengthsList reel/coil lengths, total quantity and any pre-termination requirements.
TerminationSpecify the matching connector and polish at the equipment or outlet interface.

Compatibility check

Confirm bend-radius limits, installation tension and termination compatibility using the selected cable datasheet. Do not assume all drop-cable jackets meet the same fire or outdoor requirements.

Documents to request

  • Cross-section and fiber specification
  • Mechanical and bending requirements
  • Jacket and applicable test documents
  • Reel lengths, marking and packing details

Ask which documents are available for the exact proposed model. Certification, test reports and OEM options are confirmed individually.

Make the quotation useful

Provide both total length and reel length. Identify whether connectors or installation accessories are included in the requested price.

Include destination country/port, requested date and quantity. Request itemized MOQ, lead time, payment terms and the required EXW, FOB or CIF basis. Freight and any local availability must be confirmed in the offer.

Prepare product RFQDownload RFQ checklist (.txt)

Related product requirements